ULC-S1001 Integrated Testing
Life safety systems only work when they work together. We make sure they do.
ULC-S1001 testing is now a code requirement across Alberta and Canada. Integra-Guard provides certified third-party testing to verify that all interconnected life safety systems — including fire alarm, elevators, HVAC shutdowns, access controls, generators, and more — perform as a single, coordinated system in emergency scenarios.
Our team handles the full process: test plan development, coordination with subtrades, execution, documentation, and AHJ submission. Whether you're commissioning a new build or modifying existing systems, our testing ensures your site meets code and functions flawlessly when it matters most.
Scope of Services
- ULC-S1001-compliant test plan development
- Cross-system performance validation (alarm, HVAC, access, etc.)
- Full test execution and witness coordination
- Documentation, signoff, and AHJ submission
- Deficiency reporting and retest support
When Do You Need ULC-S1001 Testing?
- New construction requiring occupancy permit
- Major modifications to interconnected life safety systems
- Fire alarm system replacements or panel upgrades
- Changes to HVAC, access control, or elevator systems
Get It Right the First Time
Integra-Guard coordinates with your electrical, mechanical, and controls contractors to deliver smooth testing and clean results. We help you avoid delays, rework, and last-minute inspection failures.
Book your ULC-S1001 consultation today — and take the guesswork out of integrated testing.